The new roof - Stonehouse Studios Blog - Stonehouse Studios

Stonehouse Studios
POTTERY, SCULPTURE, DRAWING & PAINTING TUITION
POTTERY, SCULPTURE, DRAWING & PAINTING TUITION
Go to content

The new roof

Stonehouse Studios
Published by in Studio ·
Christmas and the New Year brought a welcome break, but also a hiatus in construction due to a traditional seasonal bout of viral infections, leaving everyone feeling like a wrung-out rag.

The kitchen table in the main house was commandered to strip the Crittal windows, which had nine layers of paint on them. The windows had been rescued from a neighbouring property 30 years previously with this intended use.

The builders have made good progress, with the main studio now fully insulated and plastered ready for decorating, and all new electrical wiring installed. The re-roofed entrance lobby and kiln room are now complete and awaiting finishing works and the installation of the kilns.


JOIN OUR MAILING LIST:
© 2017 Stonehouse Studios & Malcolm Payne/Colourfast Editions
ADDRESS
Stonehouse Farm
Drayton Lane
Drayton Bassett B78 3EF

Telephone 01827 247147
CONTACT
ADDRESS
Stonehouse Farm
Drayton Lane
Drayton Bassett B78 3EF

Tel. 01827 289764
Back to content